YOUNGKER HIGH SCHOOL

CLASSROOM ADDITION PH 2

PROJECT SUMMARY:
A new eight classroom building addition is being constructed between Building 100 and 200 at the east end of the campus.

CAFETERIA / SERVINGAREA EXPANSION

PROJECTS SUMMARY:
The existing serving area is being expanded to help increase the efficiency of the student flow at lunch. The Cafeteria is being expanded by 4,000sf to accommodate the anticipated increase in enrollment.

LIBRARY EXPANSION

PROJECT SUMMARY:
A new 2,000sf addition to the existing Library is being planned in order to serve any additional student population.

WOODSHOP REMODELAND ADDITION

PROJECT SUMMARY:
1,000sf is being added to the existing Woodshop. This will also include a secure outdoor covered work area.

WEIGHT ROOM EXPANSION

PROJECT SUMMARY:
The existing Weight Room at Building 400 is expanding by 1,750sf. This addition will be used to expand the strength and conditioning space. It includes an indoor artificial turf surface on the floor.

EXTERIOR PAINTING OF CAMPUS

PROJECT SUMMARY:
All existing buildings on the campus, including Concessions and Dugouts, will be repainted. The new paint scheme will work to unify the campus.

FIRE ALARM UPGRADE

PROJECT SUMMARY:
The existing fire alarm system is being replaced and upgraded to current code requirements.

WAREHOUSE /MAINTENANCE STORAGE

PROJECT SUMMARY:
This addition will provide addition general storage capacity for the campus. It will be located at the northwest corner of Building 400.

PARKING AREA FORWHITE FLEETS

PROJECT SUMMARY:
In conjunction with the warehouse addition project, covered parking will be added to accommodate District maintenance vehicles that currently parking in the middle of the campus.

ADD WATER TO ROOF

PROJECT SUMMARY:
New water spigots will be installed on the roofs so that hoses can be used to keep the roofs clean help increase the life of the roofs.

SECURITY CAMERA UPGRADE

PROJECT SUMMARY:
New camera locations will be added to the existing system to increase security at the campus.

REMOVE VCT ANDPOLISH CONCRETE

PROJECT SUMMARY:
Existing VCT (Vinyl Composite Tile) will be removed and the concrete below polished. This is becoming a popular option in several schools, because the polished concrete does not need to be maintained at the same level as VCT.   It only requires wet mopping on occasion and never needs to be sealed.

CARPET

PROJECT SUMMARY:
Old and worn out carpet will be replaced as needed throughout the campus.

MATERIAL STORAGE BINS

PROJECT SUMMARY:
The material storage bins are simple U-shaped masonry enclosures that will be used by the field maintenance crews to hold materials such as decomposed granite (DG), topsoil, etc. that will be needed to maintain the fields.

FIELD RENOVATIONS

PROJECT SUMMARY:
Add decomposed granite and new landscaping in various areas of the campus.

TENNIS COURT REFINISH

PROJECT SUMMARY:
Re-condition the existing tennis courts surfaces. It is part of the 2nd phase of funding, and programming will start next year.

TRACK SURFACE RE-COATING

PROJECT SUMMARY:
Repair damaged areas and re-coat the track at the football stadium. It is part of the 2nd phase of funding, and programming will start next year.

BLEACHER EXPANSION

PROJECT SUMMARY:
This project will increase the capacity of the existing Bleachers at the football stadium. It is part of the 2nd phase of funding, and programming will start next year.

CANOPIES AND BENCHES

PROJECT SUMMARY:
Site improvements for student dining pavilion. Adding shaded walk ways.

TURF COVERED BATTING CAGES

PROJECT SUMMARY:
The addition of turf to the batting cages will reduce the time and cost of maintaining a level grade in these areas.